Temporary Water Supply Solutions in Berkshire

Temporary Water Solutions (TWS) provides fast, flexible and fully compliant temporary water supply services across Berkshire. We support construction projects, specialist building works, healthcare facilities, commercial developments and emergency requirements, delivering reliable water solutions even where access or load restrictions apply.

Our team operates throughout Reading, Slough, Newbury, Maidenhead, Bracknell, Windsor and surrounding areas, providing responsive water logistics tailored to Berkshire’s mixed urban, rural and regulated environments.

Reliable Temporary Water Logistics Across Berkshire

Berkshire includes a wide range of sites with access constraints, weight limits and specialist construction requirements. Temporary water solutions in these settings must be carefully planned to protect structures, comply with regulations and avoid damage to surrounding infrastructure.

TWS operates a decentralised regional model that allows us to support Berkshire projects efficiently. The county benefits from:

This approach ensures Berkshire sites receive reliable water supply without compromising site constraints or build requirements.

Our Temporary Water Equipment for Berkshire Sites

All temporary water systems supplied by TWS are selected to match access conditions, delivery rate requirements and technical specifications.

WRAS-Approved Static Water Tanks

Where required, we supply WRAS-approved Enduramaxx static water tanks manufactured to Regulation 31 standards, providing safe storage for wholesome water.

Road‑Towable Water Bowsers

We supply 2,000-litre road-towable water bowsers from Western Trailers and Trailer Engineering. These units are ideal for sites where tanker access is restricted or unsuitable, including roads with weight limits or sensitive surfaces.

Each bowser can be deployed using a 4x4 vehicle, allowing controlled delivery of water in smaller volumes.

Stainless Steel Water Tanker Fleet

For sites with suitable access, our stainless steel tanker fleet provides Regulation 31–approved bulk water deliveries across Berkshire and the wider region.

Why Berkshire Projects Choose Temporary Water Solutions

Our service combines technical understanding with practical site experience.

Our leadership team includes senior water industry professionals and directors with operational experience gained through the British Army. This ensures temporary water solutions are planned and delivered safely, even on constrained or specialist sites.

From specialist construction works to healthcare-related projects, Berkshire clients trust TWS to deliver water solutions that respect site limitations and project requirements.

Temporary Water Services We Provide in Berkshire

We deliver temporary water solutions for a wide range of applications:

Request a Quote for Temporary Water Supply in Berkshire

Contact our team today to discuss your temporary water requirements in Berkshire, including specialist builds and restricted-access sites.

Phone: 0800 001 6041
Email: info@temporarywatersolutions.co.uk

Alternatively, complete our online enquiry form and a member of our team will respond within 60 minutes.

Case Study: Controlled Filling of a Hydrotherapy Pool for a New Build in Berkshire

The Challenge

A newly constructed hydrotherapy pool in Berkshire required filling prior to commissioning. The pool contractor specified that the pool needed to be filled slowly and in controlled stages to protect the structure and finishes.

The site was accessed via a road with a 7.5-tonne weight limit, meaning a conventional water tanker could not be used. A flexible solution was required to deliver water in smaller volumes while maintaining full control over the fill rate.

Our Solution

Temporary Water Solutions (TWS) provided a 4×4 vehicle and a 2,000-litre road-towable water bowser to deliver the required water in controlled loads.

Five bowser loads were delivered each day over a two-day period, supplying 20,000 litres of wholesome water in total. This approach allowed the pool to be filled gradually, in line with the contractor’s specifications, while respecting the site’s access and weight restrictions.

The Result

The hydrotherapy pool was filled safely and successfully, with no damage to the structure or surrounding access routes. The controlled delivery method met the contractor’s requirements and avoided the risks associated with bulk tanker delivery.

This project demonstrates TWS’s ability to deliver specialist, access-sensitive temporary water solutions across Berkshire.

The TWS Berkshire Service Standard

Feature Our Standard
Response Time Quotes issued within 60 minutes
Deployment 4x4, bowsers or tankers as required
Access Solutions Weight-limit and restricted-access capable
Equipment WRAS-approved tanks and bowsers
Expertise Ex-military and industry expert directors